<strike id="gegfc"><dl id="gegfc"></dl></strike>
<sub id="gegfc"></sub>

    <mark id="gegfc"></mark>

      Iran to halt nuclear power plant operation to load fuel, do repairs

      Source: Xinhua| 2019-02-21 03:44:01|Editor: Mu Xuequan
      Video PlayerClose

      TEHRAN, Feb. 20 (Xinhua) -- Iran will halt the operation of Bushehr nuclear power plant to change the fuel and do necessary repairs, an Iranian official at the Atomic Energy Organization of Iran (AEOI) was quoted as saying by Tasnim news agency on Wednesday.

      "Based on the plan, the operation of Bushehr nuclear power plant will stop on March 1 for the change of its fuel and the required repair work," the Deputy Head of the AEOI Mohammad Ahmadian said.

      "The plant will come on stream again after the repair work," he said, adding that loading fuel and implementing basic repairs are natural processes for the operations of nuclear plants.

      The construction of the Bushehr plant was started in 1975 by several German companies. However, the work was halted when the United States imposed an embargo on hi-tech supplies to Iran after the 1979 Revolution. Russia signed a contract with Iran to complete the construction in 1998.

      The power station became officially operational and was connected to Iran's national grid in September 2011, generating electricity at 40 percent capacity. The plant reached its maximum power generation capacity, namely 1,000 megawatts, in August 2012.

      TOP STORIES
      EDITOR’S CHOICE
      MOST VIEWED
      EXPLORE XINHUANET
      010020070750000000000000011105091378378251
      中文字幕日韩无线码在线一区_制服肉丝亚洲中文字幕_日韩欧美无砖专区一中文字目_国产精品点击进入在线影院高清
      <strike id="gegfc"><dl id="gegfc"></dl></strike>
      <sub id="gegfc"></sub>
      
      
        <mark id="gegfc"></mark>
          日韩欧美乱国产日韩欧美 | 日韩熟女久久久久久 | 欧美日韩国产一区二区 | 尤物精品国产第一福利网站 | 伊人久久综合热线大杳蕉 | 亚洲一级二级视频在线观看 |